No. |
Date |
Contract
No. |
Description of
Work |
Contractor |
Amount V.I. |
3RD QUARTER OF 2024 |
|
|
|
|
|
1 |
2024-07-01 |
NWSTP 03/2023,
Lot 1 |
Dispute
Avoidance/ Adjudication Board (DAAB)- DAAB Agreement- Chatham Water Treatment
Plant, Trinidad |
Tarsha Simon |
$
924,000.00 |
2 |
2024-07-01 |
NWSTP
03/2023, Lot 2 |
Dispute
Avoidance/ Adjudication Board (DAAB)- DAAB Agreement- Freeport Water
Treatment Plant, Trinidad |
Tarsha
Simon |
$
924,000.00 |
3 |
2024-07-01 |
NWSTP
03/2023, Lot 3 |
Dispute
Avoidance/ Adjudication Board (DAAB)- DAAB Agreement- Guanapo Water Treatment
Plant, Trinidad |
Tarsha
Simon |
$
924,000.00 |
4 |
2024-07-01 |
NWSTP
03/2023, Lot 4 |
Dispute
Avoidance/ Adjudication Board (DAAB)- DAAB Agreement- Navet Water Treatment
Plant, Trinidad |
Tarsha
Simon |
$
924,000.00 |
5 |
2024-07-01 |
NWSTP
03/2023, Lot 1 |
For
the Design Build for the Refurbishment of the Water Treatment Plant and
Equipment at Chatam, Trinidad |
Toshiba
Water Solutions America Inc |
$31,891,753.52 |
6 |
2024-07-01 |
NWSTP
03/2023, Lot 2 |
For
the Design Build for the Refurbishment of the Water Treatment Plant and
Equipment at Freeport, Trinidad |
Toshiba
Water Solutions America Inc |
$17,111,841.31 |
7 |
2024-07-01 |
NWSTP
03/2023, Lot 3 |
For
the Design Build for the Refurbishment of the Water Treatment Plant and
Equipment at Guanapo, Trinidad |
Toshiba
Water Solutions America Inc |
$44,488,014.63 |
8 |
2024-07-01 |
NWSTP
03/2023, Lot 4 |
For
the Design Build for the Refurbishment of the Water Treatment Plant and
Equipment at Navet, Trinidad |
Toshiba
Water Solutions America Inc |
$32,989,585.27 |
9 |
2024-07-01 |
NWSTP
02/2023 |
For
the Design Build for the Refurbishment of the Water Treatment Plant and
Equipment at Goldsborough, Trinidad |
Toshiba
Water Solutions America Inc |
$49,139,787.87 |
10 |
2024-07-01 |
NWSTP
02/2023 |
Dispute
Avoidance/ Adjudication Board (DAAB)- DAAB Agreement- Goldsborough Treatment
Plant, Trinidad |
Tarsha
Simon |
$
924,000.00 |
11 |
2024-07-23 |
MOWT-DHO-NIPDEC-08/14/53 |
Construction
of a Reinforced Concrete Wall Along Cap De Ville River at #1 Cemetery Block
Road, Off Chunilal Road, Cap De Ville, Point Fortin. |
N&N
Agency Ltd |
$
2,750,628.38 |
12 |
2024-07-23 |
MOWT-DHO-NIPDEC-
08/14/56 |
Construction
of a Reinforced Concrete U-Section Along Lallan River from Egypt Trace to
Jerningham Railway Road, Endeavour |
N&N
Agency Ltd |
$
4,541,360.79 |
13 |
2024-07-23 |
MOWT-DHO-NIPDEC-
08/14/55 |
Construction
of Reinforced Concrete Wall along the Cunupia River off Ramdhularie Lane,
Southern Main Road Cunupia |
Jeremy
Joseph Construction Co. Limited |
$
3,463,057.13 |
14 |
2024-07-23 |
MOWT-DHO-NIPDEC-
08/14/58 |
Rehabilitation
Works along La Cuesa River, Alongside Northbound Ramp, Freeport Overpass |
Jeremy
Joseph Construction Co. Limited |
$
2,162,741.63 |
15 |
2024-07-23 |
MOWT-DHO-NIPDEC-
08/14/54 |
Rehabilitation
Works along Ramkhalia Main Drain, Southern Main Road, Rousillac |
Yazel
General Contractors Limited |
$
3,369,231.11 |
16 |
2024-07-23 |
MOWT-DHO-NIPDEC-
08/14/57 |
Construction
of a Reinforced Concrete Wall Along the San Juan River at EP #53 Saddle Road,
San Juan |
Ashsingh
General Contractors Limited |
$
2,451,839.57 |
17 |
2024-07-23 |
FY
2023-2024, GW 1177 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, GW 1177 – 23/24, Upper Fondes
Amandes (Roadworks) |
Kall
Co Ltd |
$
1,255,320.00 |
18 |
2024-07-23 |
FY
2023-2024, GW 1176 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, GW 1176 – 23/24, Mendoza Road
(Drainage and Roadworks) |
Coosal's
Construction Company Limited |
$
1,225,298.25 |
19 |
2024-07-24 |
FY
2023-2024, STP 489 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, STP 489 – 23/24, Sunset Avenue
[Roadworks |
General
Earth Movers Limited |
$
1,026,737.66 |
20 |
2024-07-24 |
FY
2023-2024, VW 575 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, VW 575 – 23/24, Sunset Avenue
[Road Rehabilitation] |
Seereeram
Bros Limited |
$
1,799,077.50 |
21 |
2024-07-24 |
FY
2023-2024, VW 576 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, VW 576 – 23/24, Peterloo Road
[Road Rehabilitation] |
L.C.B
Contractors Limited |
$
1,340,781.75 |
22 |
2024-07-24 |
FY
2023-2024, VW 577 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, VW 577 – 23/24, Corinth Link
Road [Road Rehabilitation] |
Harry
Persad & Sons Limited |
$
999,776.25 |
23 |
2024-07-24 |
FY
2023-2024, VW 578 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, VW 578 – 23/24, Rushworth
Street [Road Rehabilitation] |
Junior Sammy Contractors Limited |
$
1,394,786.25 |
24 |
2024-08-06 |
FY 2023-2024, GW 1187 – 23/24 |
Programme
for Upgrading Road Efficiency – FY 2023-2024, GW 1187 – 23/24, Blue Basin
Road [Road Rehabilitation Works, Package 2] |
Kall Co Ltd |
$
712,490.63 |
25 |
2024-08-07 |
FY
2023-2024, GW 1151 – 23/24 |
Programme
for Upgrading Road Eifficiency (PURE)- FY 2023-2024 GW 1151 - 23/24, Gulf
View Drive, off La Horquette Branch Road [Road Rehabilitation Works] |
Kall
Co Ltd |
$
548,336.25 |
26 |
2024-08-07 |
FY 2023-2024, GW 1152 – 23/24 |
the
Programme for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1152 –
23/24, Off Sunset Drive Bayshore, [Road Rehabilitation] |
Harry
Persad & Sons Limited |
$
254,182.50 |
27 |
2024-08-07 |
FY
2023-2024, GW 1155 – 23/24 |
the
Programme for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1155 –
23/24, Palm Drive Road, [Road Rehabilitation] |
L.C.B.
Contractors Limited |
$
323,971.31 |
28 |
2024-08-07 |
FY
2023-2024, GW 1159 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1159 – 23/24, Caimite
Street, Off Busby Street Morvant [Road Rehabilitation] |
Vigai
And Vijay Contracting Company Limited |
$
494,826.75 |
29 |
2024-08-07 |
FY
2023-2024, GW 1160 – 23/24 |
the
Programme for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1160 –
23/24, Comprehensive Road, Off Coconut Drive, Morvant, [Road Rehabilitation] |
L.C.B.
Contractors Limited |
$
325,784.25 |
30 |
2024-08-07 |
FY
2023-2024, GW 1161 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1161 – 23/24, Off
Sawmill Avenue, Morvant, [Road Rehabilitation] |
Harry
Persad & Sons Limited |
$
589,359.38 |
31 |
2024-08-07 |
FY
2023-2024, GW 1163 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1163 – 23/24,
Boissiere Lane and Extension, Off Belmont Valley Road [Road Works] |
Vigai
And Vijay Contracting Company Limited |
$
414,519.19 |
32 |
2024-08-07 |
FY
2023-2024, GW 1164 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1164 – 23/24,
Hamil-Smith Street, Off Eastern Main Road, Success, Laventille [Road
Rehabilitation] |
Coosal's
Construction Company Limited |
$
390,267.90 |
33 |
2024-08-07 |
FY
2023-2024, GW 1153 – 23/24 |
the
Programme for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1153 –
23/24, Neckles Drive [Drainage & Road Works] |
Kall
Co Ltd |
$
1,450,845.00 |
34 |
2024-08-07 |
FY
2023-2024, GW 1154 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1154 – 23/24, Newbury
Hill Network [Road Works] |
Harry
Persad & Sons Limited |
$
1,975,916.25 |
35 |
2024-08-07 |
FY
2023-2024, GW 1157 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1157 – 23/24, Sunset
Drive [Road Works] |
Seereeram
Bros Limited |
$
1,317,597.19 |
36 |
2024-08-07 |
FY 2023-2024, GW 1158 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1158 – 23/24,
Terracevale Road [Road Works] |
L.c.b.
Contractors limited |
$
825,412.50 |
37 |
2024-08-07 |
FY
2023-2024, GW 1162 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1162 – 23/24, Small
Street [Drainage, Concrete & Road Works] |
Harry
Persad & Sons Limited |
$
2,037,420.00 |
38 |
2024-08-07 |
FY 2023-2024, GW 1176 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1176 – 23/24, Mendoza
Road [Road Works] |
Coosal's
Construction Company Limited |
$
1,225,298.25 |
39 |
2024-08-07 |
FY
2023-2024, GW 1177 – 23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1177 – 23/24, Upper
Fondes Amandes [Roadworks] |
Kall
Co Ltd |
$
1,255,320.00 |
40 |
2024-08-07 |
MOWT
(PURE) Ref: 4/11/10 |
Supply
and Installation of Twenty-Four (24) Helical Piles at Lengua Road |
Pfwi
Engineering Services Ltd |
$
648,303.48 |
41 |
2024-08-29 |
FY
2023-2024, STAD 383-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD 383-23/24, Little
Coora Road, Off Cumuto Road, Near Bridge at Ch. 2+700, [Drainage Works] |
N&N
Agency Ltd |
$
662,000.63 |
42 |
2024-08-29 |
FY
2023-2024, STAD 384-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD 384-23/24, Eastern
Main Road, Sangre Grande, Between Ch. 5+780 to Ch. 6+250, [Drainage &
Concrete Works] |
Premium
maintenance & repairs co. Ltd. |
$
3,358,327.50 |
43 |
2024-08-29 |
FY
2023-2024, STAD 385-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD 384-23/24, Eastern
Main Road, Sangre Grande, Between Ch. 6+000 to Ch. 6+630, [Drainage &
Concrete Works] |
Top
Aces Enterprises Limited |
$
1,477,698.75 |
44 |
2024-08-29 |
FY
2023-2024, STAD 386-23/24 |
the
Programme for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD
386-23/24, Eastern Main Road, Sangre Grande, Between Ch. 6+650 to Ch. 6+800,
[Drainage & Concrete Works] |
Bishashco
Enterprises Limited |
$
2,327,923.13 |
45 |
2024-08-29 |
FY
2023-2024, STAD 387-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD 387-23/24, Eastern
Main Road, Sangre Grande, Between Ch. 6+500 to Ch. 6+890, [Drainage &
Concrete Works] |
Carl
Company Limited |
$
1,168,818.75 |
46 |
2024-08-29 |
FY
2023-2024, STAD 388-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD 388-23/24, Eastern
Main Road, Sangre Grande, Between Ch. 6+900 to Ch. 8+000, [Drainage &
Concrete Works] |
Sloane
Services Limited |
$
3,661,143.75 |
47 |
2024-08-29 |
FY 2023-2024, GW 1156-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1156-23/24, Rainbow
Ridge, Off Terracevale Road [Drainage & Road Works] |
Kall
Co Ltd |
$
2,019,352.50 |
48 |
2024-08-29 |
FY
2023-2024, CR 707-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, CR 707-23/24, Grand
Couva Road, 12.5 km [Slope Stabilization & Associated Works] |
Jeremy
Joseph construction co. Limited |
$
5,785,547.63 |
49 |
2024-08-29 |
FY
2023-2024, STAD 390-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STAD 390-23/24, LP# 167
Paria Main Road [Slope Stabilization & Associated Works] |
Maraj
Hill General Contractors Company Limited |
$
1,758,821.63 |
50 |
2024-08-29 |
FY
2023-2024, GW 1165-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1165-23/24, Manda
Terrace, Off St. Francois Valley Road, Belmont [Slope Stabilization &
Associated Works] |
Trinidad
And Tobago Innovative Contractors Limited |
$
1,015,158.38 |
51 |
2024-08-29 |
FY
2023-2024, GE 652-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GE 652-23/24, Sunrise
Loop & College Avenue, Off Trincity Central Road [Road Works] |
Coosal's
Construction Company Limited |
$
664,172.44 |
52 |
2024-08-29 |
FY 2023-2024, GE 653-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GE 653-23/24, Trincity
Boulevard, From Cane Farm Road to Dinsley Main Road [Road Works] |
Seereeram
Bros Limited |
$
2,121,539.06 |
53 |
2024-08-29 |
FY 2023-2024, GE 654-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GE 654-23/24, Trincity
Central Road, From Eastern Main Road to Trincity Roundabout [Road
Rehabilitation] |
Junior
Sammy Contractors Limited |
$
2,263,727.81 |
54 |
2024-08-29 |
FY 2023-2024, GW 1174-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1174-23/24, Sixth
Drive, Off Mt D’or Road [Road Works] |
L.C.B.
Contractors Limited |
$
712,249.31 |
55 |
2024-08-29 |
FY
2023-2024, GW 1175-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1175-23/24, Mt D’or
Road, Off Eastern Main Road, Mt. D’or [Road Works] |
Harry
Persad & Sons Limited |
$
2,459,964.38 |
56 |
2024-08-29 |
FY
2023-2024, GE 661-23/24 |
Upgrading
Road Efficiency (PURE) – FY 2023-2024,
GE 661-23/24, Mission Road, Five Rivers [Road Works] |
Harry
Persad & Sons Limited |
$
932,289.19 |
57 |
2024-08-29 |
FY
2023-2024, GE 662-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GE 662-23/24, St.
Michael Road, Tacarigua [Road Works] |
Seereeram
Bros Limited |
$
927,090.57 |
58 |
2024-08-29 |
FY
2023-2024, GE 663-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GE 663-23/24, Balthazar
Street, From Eastern Main Road to Achong Trace [Road Works] |
Harry
Persad & Sons Limited |
$
1,276,326.56 |
59 |
2024-08-29 |
FY
2023-2024, GE 664-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GE 664-23/24, Warren
Street, From Eastern Main Road to Gordon Street [Road Works] |
Vigai
And Vijay Contracting Company Limited |
$
1,200,740.06 |
60 |
2024-08-29 |
FY
2023-2024, GW 1166-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1166-23/24, Gloster
Lodge Road, Off Belmont Circular Road [Road Rehabilitation] |
Vigai
And Vijay Contracting Company Limited |
$
1,028,647.13 |
61 |
2024-08-29 |
FY
2023-2024, GW 1167-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1167-23/24, St. Clair
Avenue, Off Queen’s Park Savannah [Road Rehabilitation] |
Coosal's
Construction Company Limited |
$
1,899,964.69 |
62 |
2024-08-29 |
FY
2023-2024, GW 1172-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1172-23/24, Acono
Road, Off Maracas Royal Road [Road Works] |
Coosal's
Construction Company Limited |
$
2,173,970.70 |
63 |
2024-08-29 |
FY
2023-2024, GW 1173-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1173-23/24, La
Sagesse Road, Off Saddle Road, Santa Cruz [Road Rehabilitation] |
Junior
Sammy Contractors Limited |
$
2,180,852.44 |
64 |
2024-08-28 |
367 |
Supply
and Installation of one (1) 36000 BTU Split Air Conditioning Unit serving the
Mezzanine Floor South; and a 25T DX Split Unit serving the Ground Floor South
at the Industrial Court of Trinidad and Tobago |
Coleman
Supplies and Services Ltd |
$
418,150.14 |
65 |
2024-09-07 |
106/24 |
Supply
and Installation Temporary Hoarding at Victoria Court, 81-84 Queen Street,
Port of Spain |
AAM
Construction Ltd |
$
198,000.00 |
66 |
2024-09-25 |
GW
1186-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1186-23/24, Braemar
Road, Off Coblentz Avenue [Road Works] |
Kall
Co Ltd |
$
801,640.13 |
67 |
2024-09-23 |
STP
492-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STP 492-23/24,
Parrylands Main Road, Off Southern Main Road, Guapo, Between Ch. 0+000 to Ch.
1+600, [Road Rehabilitation] |
Junior
Sammy Contractors Limited |
$
3,423,598.20 |
68 |
2024-09-23 |
STP
493-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, STP 493-23/24, Shearer
Street & Associated Streets, Off S.S. Erin Road, Los Bajos [Road
Rehabilitation] |
Kall
Co Ltd |
$
2,569,897.69 |
69 |
2024-09-25 |
VE
318-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, VE 318-23/24, Naparima
Mayaro Road 30.40 km, Tableland, [Slope Stabilization & Associated Works] |
Jeremy
Joseph Construction Co. Limited |
$
3,368,481.19 |
70 |
2024-09-25 |
VW
572-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, VW 572-23/24, Manahambre
Road 2.30 km, [Slope Stabilization & Associated Works] |
L.C.B.
Contractors Limited |
$
1,827,640.24 |
71 |
2024-09-25 |
VW
573-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, VW 573-23/24, Papourie
Road 13.80 km, [Slope Stabilization & Associated Works] |
Paras
Singh General Contractors Ltd |
$
6,298,256.25 |
72 |
2024-09-25 |
VW
579-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, VW 579-23/24, Guaracara
Tabaquite 11.50 km [Culvert Stabilization & Associated Works] |
Bluewave
Construction Limited |
$
2,389,822.88 |
73 |
2024-09-23 |
GW
1180-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1180-23/24, Valley
View Network, Off Maracas Royal Road [Concrete, Drainage & Road Works] |
Harry
Persad & Sons Limited |
$
3,374,755.31 |
74 |
2024-09-23 |
GW
1181-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1181-23/24, Sinanan
Extension Road, Off Saddle Road [Drainage & Road Works] |
L.C.B.
Contractors Limited |
$
648,024.30 |
75 |
2024-09-23 |
GW
1183-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, GW 1183-23/24, Sweet
Brair Road, Maraval Road [Road Rehabilitation] |
Kall
Co Ltd |
$
602,712.00 |
76 |
2024-09-23 |
VE
319-23/24 |
Programme
for Upgrading Road Efficiency (PURE) – FY 2023-2024, VE 319-23/24, 6th
Company Circular Road, Off 6th Company Road [ Road Works] |
L.C.B.
Contractors Limited |
$
1,183,829.63 |
77 |
2024-09-26 |
66/24 |
Rehabilitation
Works along the Santa Cruz River, Guerra Road, Santa Cruz |
N&N
Agency Ltd |
$
1,692,937.13 |
78 |
2024-09-26 |
67/24 |
Construction
of a Reinforced Concrete U-Section along Tributary to La Cuesa River at LP#5
Cemetery Road, Freeport |
N&N
Agency Ltd |
$
1,713,988.24 |
79 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/62 |
Rehabilitation
Works along the Maraval River in the vicinity of Adam’s Bagels, Saddle Road,
Maraval |
Yaztel
General Contractors Limited |
$
2,114,257.50 |
80 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/66 |
RFP
for Construction of a Reinforced Concrete pile walls along the Rio Negro
River at #225 Siparia Old Road, Avocat Village, Fyzabad |
Yaztel
General Contractors Limited |
$
2,748,570.48 |
81 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/61 |
RFP
for Rehabilitation Works along the Petit Valley Ravine, U/S Morne Coco Road,
Petit Valley |
Ricky
Raghunanan Ltd |
$
1,692,937.13 |
82 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/64 |
RFP
for Rehabilitation Works along the Santa Anna Ravine, Off Elizabeth Parkway,
St. Joseph |
Ricky
Raghunanan Ltd |
$
2,058,872.06 |
83 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/59 |
RFP
for Clearing and Desilting of the Couva River Mouth |
Raldon
Construction Company Limited |
$16,898,062.50 |
84 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/70 |
RFP
for Rehabilitation Works along the Champs Fleurs Main Drain, Champ Fleurs |
Yaztel
General Contractors Limited |
$
2,487,928.78 |
85 |
2024-09-26 |
MOWT-DHO-NIPDEC-08/14/68 |
RFP
for Rehabilitation Works along the Malik River Upstream EMR/ Churchill
Roosevelt Highway link Road, Morvant |
Yaztel
General Contractors Limited |
$
1,776,870.56 |
86 |
2024-09-26 |
68/24 |
RFP
for Rehabilitation Works to Tributary to San Juan River off Bridge Road,
Aranguez |
N&N
Agency Ltd |
$
2,083,347.56 |
87 |
2024-09-26 |
69/24 |
RFP
for Rehabilitation Works along the St. Joseph River, Narine Trace, Curepe |
Ashsingh General Contractors Limited |
$
2,480,808.83 |
|
|
|
|
|
|
|
|
|
|
|
|
2ND QUARTER OF 2024 |
|
|
|
|
|
1 |
05/04/2024 |
|
The opening of
the 2023/2025 Pharmaceutical Tender Period of Non-Pharmaceutical Supplies |
Eye See You Ophthalmic and Medical
Supplies Ltd |
$1,791,280.00 |
2 |
19/05/2024 |
63/23 |
The
Decommissioning, Supply and Installation of Existing AC at New Wing Serving
the First Floor South and the First Floor New Wing at the Trinidad and Tobago
Forensic Science Centre |
R and R Trading Company Limited |
$230,871.10 |
3 |
12/04/2024 |
|
For the Supply
of Non-Pharmaceutical Supplies 2023-2025 |
The Medical Supply Co. (Caribbean)
Ltd |
$17,150,000.00 |
4 |
09/04/2024 |
|
For the Supply
of Non-Pharmaceutical Supplies 2023-2025 |
RD Global Limited |
$3,434,430.00 |
5 |
19/04/2024 |
52/24 |
For the
Provision of Landscaping Services at NIPDEC’s Chaguaramas Warehouse, located
at First Avenue North, Chaguaramas. |
Europa (Trinidad and Tobago) Limited |
$240,000.00 |
6 |
21/05/2024 |
58/24 |
To Provide
Design-Build Services for the Construction of a Shopping Centre at No. 43
Independence Square, Port of Spain |
Yorke Structures Limited |
$24,751,188.15 |
7 |
20/05/2024 |
24/11/2023 |
Supply,
Installation and Commissioning of Three (3) Air Conditioning Units at
Cipriani College of Labour and Cooperative Studies, Valsayn Campus |
Peake Technologies Limited |
$249,331.50 |
8 |
11/04/2024 |
61/24 |
Provision of
Construction Supervision and FIDIC Engineering Services for the NWSTP –
Package 1 – Goldsborough Tobago |
Lauriston Lewis Associates Ltd. |
7.20% |
9 |
11/04/2024 |
230724 |
For the
Provision of Construction Supervision and FIDIC Engineering Services for the
NWSTP- Package 2- Santa Cruz, North Oropouche and Guanapo |
Beston Consulting Limited |
5.16% |
10 |
11/04/2024 |
230724 |
For the
Provision of Construction Supervision and FIDIC Services for the NWSTP-
Package 3- Freeport, Navet and Chatham. |
Beston Consulting Limited |
5.16% |
11 |
05/04/2024 |
230724 |
Supply and
Installation of Four (4) 20T, complete VRF Split Air Conditioning Units at
the Naparima Bowl |
Industrial Electrical Services Ltd |
$1,209,120.00 |
12 |
17/06/2024 |
PURE 14/24 |
STAD 376 –
23/24, Manzanilla Mayaro Road [Rehabilitation / Reconstruction Works –
Package 6, Chainage 4+360 to 5+360] |
Coosal's Construction Company Limited |
$11,069,188.76 |
13 |
17/06/2024 |
PURE 15/24 |
STAD 378 –
23/24, Manzanilla Mayaro Road [Rehabilitation / Reconstruction Works –
Package 8, Chainage 6+360 to 7+414] |
Coosal's Construction Company Limited |
$11,541,471.98 |
14 |
17/06/2024 |
PURE 12/24 |
STAD 377 –
23/24, Manzanilla Mayaro Road [Rehabilitation / Reconstruction Works –
Package 7, Chainage 5+360 to 6+360] |
Kall Co Ltd |
$11,600,696.25 |
15 |
20/06/2024 |
PURE 13/24 |
VE 306 23/24,
Moruga Road, Chainage 5+400 |
Patrick Gordon's Construction Limited |
$1,492,295.07 |
16 |
20/06/2024 |
Letter of award
issued - Contractor to sign contract |
VE 307 23/24,
Moruga Road, Chainage 13+950 |
Vee's Enterprises Limited |
$2,671,979.06 |
17 |
20/06/2024 |
Letter of Award
issued - Contractor to sign contract |
VE 308 23/24,
Moruga Road, Chainage 16+200 |
Bluewave Construction Limited |
$1,389,495.94 |
18 |
06/06/2024 |
Letter of Award
issued - Contractor to sign contract |
Design, Supply
and Installation of a Fire Safety System at NIPDEC’s C50 Building |
Safety Plus Ltd |
$1,610,346.38 |
19 |
17/06/2024 |
Letter of Award
issued - Contractor to sign contract |
STAD 379 –
23/24, Manzanilla Mayaro Road [Rehabilitation / Reconstruction Works –
Package 9, Chainage 7+414 to 8+360 |
Carib Asphalt Pavers Limited |
$12,087,095.63 |
20 |
17/06/2024 |
Letter of Award
issued - Contractor to sign contract |
STAD 380 –
23/24, Manzanilla Mayaro Road [Rehabilitation / Reconstruction Works –
Package 10 |
Carib Asphalt Pavers Limited |
$12,062,778.75 |
|
|
|
|
|
|
|
|
|
|
|
|
|
1ST QUARTER OF 2024 |
|
|
|
|
21 |
26/2/2024 |
38/24 |
For Design
Consultancy Services for the Integrated Logistics Support Facility at the
Trinidad and Tobago Coast Guard, Heliport Base |
One Ten
Architects and Planners Limited |
$
1,010,000.00 |
22 |
03/01/2024 |
N/A |
For the Provision of Electrical
Upgrade Works at the NIPDEC Chaguaramas Warehouse Complex |
Power Tech
Electrical Services Company Limited |
$618,270.92 |
23 |
03/01/2024 |
185 |
For the Outfitting of Dormitories for
the Relocation of Two (2) Companies of the Second Infantry Battalion of the
Trinidad and Tobago Regiment Camp La Romain |
Metal Designs
& Concepts Limited (MD-CUM) |
$1,264,642.11 |
24 |
03/05/2024 |
N/A |
For Decommissioning, Supply and
Installation of New A/C Units at NIPDEC’s Head Office |
Peake
Technologies Limited |
$218,913.75 |
25 |
03/07/2024 |
N/A |
For the Provision of Elevator
Maintenance and Servicing Works at the NIPDEC Central Stores Warehouse
located at Airways Drive, Chaguaramas. |
R.B.P. Lifts
Limited |
$99,458.39 |
26 |
26/3/2024 |
188 |
For Design Consultancy Services for
the Structural Assessment and Replacement of Crawler Lifts at The National
Library and Information Systems Authority (NALIS) Building |
Alvair Limited |
$493,681.55 |
27 |
02/07/2024 |
MOWT-DHO-NIPDEC-08/14/42 |
Construction of a Reinforced Concrete
Wall along the San Juan River, Saddle Road, Lower Santa Cruz |
Arion
Contractors Limited |
$
3,908,860.31 |
28 |
02/07/2024 |
MOWT-DHO-NIPDEC-08/14/43 |
Construction of a Reinforced Concrete
Wall along Aripo River, LP#58, Carib Circular, La Platta Gardens |
Carl Company
Limited |
$
4,142,172.38 |
29 |
02/07/2024 |
MOWT-DHO-NIPDEC-08/14/44 |
Construction of a Reinforced Concrete
Wall along Petit Valley Ravine, D/S Morne Coco Road, Petit Valley |
R.B.M.R
Construction Company Limited |
$
3,732,819.75 |
30 |
02/07/2024 |
DD-NIPDEC-08/14/45 |
Construction of Reinforced Concrete
Wall along Mausica River in the Vicinity of the Basketball Court on Mendez
Trace, Arima |
Arion
Contractors Limited |
$
2,612,677.96 |
31 |
02/07/2024 |
MOWT-DHO-NIPDEC-08/14/47 |
Construction of a Reinforced Concrete
Wall along Cunapo River, Eastern Main Road, Sangre Grande |
Carl Company
Limited |
$
3,518,039.25 |
|
|
|
|
|
|
|
4TH QUARTER OF 2023 |
|
|
|
|
32 |
10/06/2023 |
GW 1114-22/23 |
Grand Curacaye Rd, off Saddle Rd. Santa Cruz (Concrete,
Drainage & Rd. Wks.) |
Kall Co. Ltd. |
$ 2,149,438.50 |
33 |
10/06/2023 |
GW 1118-22/23 |
Hillview Road, off 6th Av. Malick (Road Rehabilitation) |
Kall Co. Ltd. |
$ 1,242,802.69 |
34 |
10/06/2023 |
STAD 370-22/23 |
Roads 1-5, off Ojoe Road, Sangre Grande (Road Rehabilitation) |
Kall Co. Ltd. |
$ 1,297,593.00 |
35 |
10/06/2023 |
STAD 371-22/23 |
Ojoe Road, off Brierley Street, Sangre Grande (Road
Rhabilitation) |
Kall Co. Ltd. |
$ 2,140,335.45 |
36 |
10/06/2023 |
VW 568-22/23 |
Hutchinson Drive, La Romaine (Road Works) |
Kall Co. Ltd. |
$ 530,100.45 |
37 |
10/06/2023 |
GE 637-22/23 |
Mahogany Drive, off Samaan Drive, Olton Road (Road Works) |
Kall Co. Ltd. |
$ 379,572.19 |
38 |
10/06/2023 |
GE 640-22/23 |
North Coast Rd. from La Fillette to Blanchisseuse (Road
Rehabilitation) |
Kall Co. Ltd. |
$ 1,712,205.00 |
39 |
10/06/2023 |
GW 1115-22/23 |
Hillscrest View, off La Canoe Rd., Saddle Rd, Santa Cruz (Road
Works |
LCB Contractors Ltd. |
$ 1,507,949.44 |
40 |
10/06/2023 |
Gw 1119-22/23 |
Hirondelle Street, off Lady Yiunbg Road, Morvant (Road
Rahabilitation) |
LCB Contractors Ltd. |
$ 924,325.88 |
41 |
10/06/2023 |
GW 1127-22/23 |
Almond Drive, off De Norbriga, Morvant (Road Rahabilitation) |
LCB Contractors Ltd. |
$ 619,801.88 |
42 |
10/06/2023 |
GW 1120-22/23 |
Park Street, off Lady Young Road, Morvant (Road
Rahabilitation) |
Coosal's Construction Co. Ltd. |
$ 414,879.30 |
43 |
10/06/2023 |
GW 1059-22/23 |
Fisher & Moore Avenue, off St. Ann's Road (Road
Rehabilitation) |
Coosal's Construction Co. Ltd. |
$ 673,617.04 |
44 |
10/06/2023 |
GW 1116-22/23 |
Cantaro Extension, from Saddle Road to Maraj Trace (Road
Rahabilitation) |
Coosal's Construction Co. Ltd. |
$ 1,910,280.49 |
45 |
10/06/2023 |
STAD 368-22/23 |
La Seiva Road from Toco Main Road to Foster Road (Road
Rehabilitation) |
Seereeram Bros Ltd. |
$ 1,664,234.55 |
46 |
10/06/2023 |
STAD 369-22/23 |
KP Lands - La Platta Gardens, off EMR (Road Rehabilitation) |
Seereeram Bros Ltd. |
$ 1,353,305.25 |
47 |
10/06/2023 |
VW 569-22/23 |
SMR from Alice Street to Church Street, La Romaine (Road
Rahabilitation) |
Seereeram Bros Ltd. |
$ 1,095,818.63 |
48 |
10/06/2023 |
GE 638-22/23 |
Sellier Street from Frederick Street, Curepe (Road
Rehabilitation) |
Jusamco Pavers Ltd. |
$ 1,861,509.38 |
49 |
10/06/2023 |
GE 639-22/23 |
Smart Street from Warren Street to Fraser Street (Road
Rehabilitation) |
Jusamco Pavers Ltd. |
$ 1,337,707.80 |
50 |
10/06/2023 |
GW 1113-22/23 |
McCarthy Street, off Cantaro Ext. Saddle Road, Santa Cruz
(Road Rehabilitation) |
Harry Persad & Sons Ltd. |
$ 549,054.00 |
51 |
10/06/2023 |
GW 1121-22/23 |
Laventille Ext. Rd, from St. Francois Valley rd to Mon Repos
(Road Rehabilitation) |
Harry Persad & Sons Ltd. |
$ 1,068,395.53 |
52 |
10/09/2023 |
CR 699-22/23 |
Arena Road, Brazil (Concrete, Drtainage |
Kelvin Sales & Marketing Ltd. |
$ 1,164,895.88 |
53 |
10/09/2023 |
GW 1143-22/23 |
Fort George (SS, DR&RWs) off George Cabral St. St. James
(Slope Stabilisation) |
R. Baldeosingh Services Ltd. |
$ 1,637,624.07 |
54 |
10/10/2023 |
MOWT-DHO-NIPDEC-08/14/30 |
Const. Reinforce Concrete Wall along Simeon Ravine, Sparrow
Drive Ext. P/Valley |
Ricky Raghunanan Ltd. |
$ 1,515,776.63 |
55 |
10/10/2023 |
DD-NIPDEC-08/14/36 |
Const. Reinforce Concrete Wall along Arima River off Trisha
Av.Mandalay G'dns |
Ricky Raghunanan Ltd. |
$ 4,212,858.38 |
56 |
10/10/2023 |
MOWT-DHO-NIPDEC-08/14/31 |
Const. Reinforce Concrete Wall along the Cunupia River,
Manzana Drive |
Yaztel General Contractors Ltd. |
$ 2,641,072.50 |
57 |
10/10/2023 |
DD-NIPDEC-08/14/34 |
Rahabilitation Works along the St. Ann's River behind Pizza
Boys |
Yaztel General Contractors Ltd. |
$ 2,788,761.94 |
58 |
16/10/2023 |
VW 567-22/23 |
LP#88 Mayaro Rd. Mayo (Slope Stabilization & Associated
Works) |
Shasac Enginnering & Const. Services Ltd. |
$ 2,929,608.00 |
|
|
|
|
|
|
|
3RD QUARTER OF 2023 |
|
|
|
|
59 |
18/7/2023 |
VW 555 - 22/23 |
Stewart Street,
Pleasantville, San Fernando |
Kall Co Limited |
$
539,699.74 |
60 |
18/7/2023 |
STP 484 - 22/23 |
Fanny Village,
Point Fortin (Road Rehabilitation) |
Carib Asphalt
Pavers Limited |
$
1,534,252.50 |
61 |
18/7/2023 |
STP 485 - 22/23 |
Fanny Village
Point Fortin (Road Rehabilitation) |
General Earth
Movers Limited |
$
1,251,657.00 |
62 |
18/7/2023 |
STP 486 - 22/23 |
Fanny Village
Point Fortin (Road Rehabilitation) |
General Earth
Movers Limited |
$
677,395.13 |
63 |
18/7/2023 |
STP 487 - 22/23 |
Point Fortin
(Road Rehabilitation) |
Carib Asphalt
Pavers Limited |
$
3,230,642.25 |
64 |
18/7/2023 |
GW 1093 -22/23 |
Bay Road, off
Ethel Street (Road Rehabilitation) |
Coosal’s
Construction Co. Ltd. |
$
844,770.68 |
65 |
18/7/2023 |
GW 1094 - 22/23 |
Clarence Street (Road Rehabilitation) |
Harry Persad & Sons Ltd. |
$ 696,542.93 |
66 |
18/7/2023 |
GW 1095 - 22/23 |
Church Street (Road Rehabilitation) |
Harry Persad & Sons Ltd. |
$ 509,024.55 |
67 |
18/7/2023 |
GW 1096 - 22/23 |
Hamilton Street 9Road Rehabilitation) |
Kall Co. Ltd. |
$ 309,514.21 |
68 |
18/7/2023 |
GW 1097 - 22/23 |
Kew Place (Road Rehabilitation) |
Coosal's Construction Co. Ltd. |
$ 710,464.80 |
69 |
18/7/2023 |
GW 1090 - 22/23 |
Blue Basin, D'Martin 9Road
Rehabilitation) |
Jusamco Pavers Limited |
$ 842,166.47 |
70 |
18/7/2023 |
GW 1091 - 22/23 |
Blue Basin D'Martin (Drainage Works
Pkg. 1) |
Kurv Enterprises Limited |
$ 1,330,850.89 |
71 |
18/7/2023 |
GW 1092 - 22/23 |
Blue Basin D'Martin (Drainage Works
Pkg. 2) |
Kelvin Sales & Marketing Ltd. |
$ 1,209,877.84 |
72 |
18/7/2023 |
STP 478 - 22/23 |
Fyzabad Brance Rd. (Road
Rehaibilitation) |
Kall Co. Limited |
$ 841,574.25 |
73 |
18/7/2023 |
VW 542 - 22/23 |
S.S. Erin , Santa Flora (Road
Rehabilitation) |
Jusamce Pavers Limited |
$ 2,270,961.00 |
74 |
21/7/2023 |
STAD 363 - 22/23 |
Manzanilla Mayaro Rd. (Rehab./Reconst
Pkg. 1) |
Carib Asphalt Pavers Limited |
$ 18,196,781.63 |
75 |
21/7/2023 |
STAD 364 - 22/23 |
Manzanilla Mayaro Rd. (Rehab./Reconst
Pkg. 2) |
Namalco Construction Services Ltd. |
$ 15,163,984.69 |
76 |
21/7/2023 |
STAD 366 - 22/23 |
Manzanilla Mayaro Rd. (Rehab./Reconst
Pkg. 3) |
Kall Co. Limited |
$ 13,275,184.50 |
77 |
24/7/2023 |
STAD 356 - 22/23 |
Manzanilla Mayaro Rd. (RAP &
Stockpiling) |
Namalco Construction Services Ltd. |
$ 21,558,735.00 |
78 |
24/7/2023 |
STAD 357 - 22/23 |
Manzanilla Mayaro Rd. (RAP &
Stockpiling) |
Namalco Construction Services Ltd. |
$ 1,946,952.56 |
79 |
08/02/2023 |
CR 695-22/23 |
Camden Base Road, Couva (Roadworks) |
General Earth Movers Limited |
$ 2,064,595.50 |
80 |
08/02/2023 |
CR 696-22/23 |
Camden Base Road, Couva
(Drainage/Roadworks) |
Kall Co. Limited |
$ 2,127,423.38 |
81 |
08/09/2023 |
GE 629-22/23 |
La Horquetta Amaryllis Crescent (Road
Works) |
Coosal's Construction Co. Ltd. |
$ 902,083.05 |
82 |
08/09/2023 |
GE 628-22/23 |
La Horquetta Winston Mulligan Dr.
(Road Works) |
Harry Persad & Sons Limited |
$ 459,731.25 |
83 |
08/09/2023 |
DD-NIPDEC-08/14/35 |
Const. reinforce Concrete Wall,
Guapo, P/Fortin |
WBI Construction Services Ltd. |
$ 6,858,738.56 |
84 |
11/8/12023 |
|
Disposal of Pharm & Non-Pharm |
Sanitec Limited |
$ 5,248,575.00 |
85 |
14/8/2023 |
GE 632-22/23 |
Dunderhill Rd. Lopinot (Culvert
Reconst & Assoiated Works) |
Premium Maintenance & Repairs Co. Ltd. |
$ 3,947,505.58 |
86 |
18/8/2023 |
GE 1108-22/23 |
Cipriani Av. Morvant (Road
Rehabilitation) |
Jusamco Pavers Ltd. |
$ 649,563.75 |
87 |
14/8/2023 |
VW 554-22/23 |
Circular Left #1 (Drainage & Road
Works) |
S. Persad Contracting Services Ltd. |
$ 592,017.53 |
88 |
14/8/2023 |
VW553-22/23 |
Circular Left #2 (Drainage & road
Works) |
Maitland & Sons Ltd. |
$ 653,004.00 |
89 |
14/8/2023 |
GW 1107-22/23 |
Morvant Old Road 9 Road
Rehabilitation) |
Coosal's Construction Co. Ltd. |
$ 475,742.03 |
90 |
14/8/2023 |
STAD 358-22/23 |
Blake Avenue, Sangre Grande (Road
Rehabilitation) |
Seereeram Bros Ltd. |
$ 540,391.50 |
91 |
14/8/2023 |
GW 1105-22/23 |
7th Avenue North Malick (Drainage
& Road Works) |
LCB Contractors Ltd. |
$ 1,122,127.88 |
92 |
14/8/2023 |
STAD 359-22/23 |
Jacob Coat, Northeastern Settlement
S/Grande (Drainage&Road Woks) |
LCB Contractors Ltd. |
$ 776,120.40 |
93 |
14/8/2023 |
STAD 360-22/23 |
Providence St. Sangre Grande (Road
Rahabilitation) |
Harry Persad & Sons Ltd. |
$ 345,571.88 |
94 |
14/8/2023 |
STAD 362-22/23 |
Sangre Grande Network Package 1
(Concrete, Drainage & Road Works) |
Harry Persad & Sons Ltd. |
$ 1,861,066.35 |
95 |
14/8/2023 |
GW 1106 - 22/23 |
Benjamin Drive, Never Dirty (Drainage
& Road Works) |
Kall Co Ltd. |
$
819,232.43 |
96 |
14/8/2023 |
STAD 361-22/23 |
Railway & Picton Road, S/Grande
(Drainage & Road Works) |
Kall Co. Ltd. |
$
1,469,637.68 |
97 |
17/8/2023 |
GW1102-22/23 |
Chancery Lane, POS (Road
Rehabilitation) |
Seereeram Bros Ltd. |
$
725,408.52 |
98 |
17/8/2023 |
GW1101-22/23 |
Francis Street, POS ( Road
Rehabilitation) |
Kall Co Ltd. |
$
294,788.59 |
99 |
17/8/2023 |
GW1098-22/23 |
Chacon Street , POS (Road
Rehabilitation) |
Harry Persad & Sons Ltd. |
$
783,714.71 |
100 |
17/8/2023 |
GW1099-22/23 |
Charlotte street, POS (Road
Rehabilitation) |
Jusamco Pavers Ltd. |
$
488,375.44 |
101 |
21/8/2023 |
GE 636-22/23 |
O'Meara Road Upgrade Pack. 2
(Concrete Drainage & Road Wks) |
Jusamco Pavers Ltd. |
$
31,943,753.33 |
102 |
21/8/2023 |
GE 635-22/23 |
Omeara Road Upgrade Package 1
(Concrete Drainage & Rpad Works) |
Kall Co Ltd. |
$
25,542,404.66 |
103 |
24/8/2023 |
VE 304-22/23 |
Penal Rock Road 24km (Slope
Stabilisation & Associated Works) |
Bluewave Construction Ltd. |
$ 2,124,762.75 |
104 |
24/8/2023 |
VE 303-22/23 |
Penal Rock Road 24.5km (Slope
Stabilisation & Associated Works) |
General Earth Movers Ltd. |
$ 2,080,000.94 |
105 |
24/8/2023 |
VW 556-22/23 |
Naparima Mayaro Road LP#A129 (Slope
Stabilisation & Associated Wks) |
Gibraltar Consultants and Contractors
Ltd. |
$ 2,032,903.13 |
106 |
24/8/2023 |
VE 305-22/23 |
Penal Rock Road 23.3km (Slope
Stabilisation & Associated Works) |
Vee's Enterprises Ltd. |
$ 4,051,389.38 |
107 |
29/8/2023 |
GW 1083-22/23 |
North Coast Rd. 10.3km North Coast
Rd. (Slope Stabilisation & Asoc. Wks) |
R. Baldeosingh Services Ltd. |
$ 8,638,459.09 |
108 |
29/8/2023 |
GE 633-22/23 |
Priority Bus Route, Five Rivers,
Arpouca 9Culvert Recon. & Assoc. Wks.) |
Harry Persad & Sons Ltd. |
$ 13,789,495.54 |
109 |
09/01/2023 |
STAD 374-22/23 |
Manzanilla Mayaro Road, Ch.2+300 to
3+060 (Rehab./Reconst. Package 3) |
Namalco Construction Services Ltd. |
$ 19,265,492.81 |
110 |
09/01/2023 |
STAD 375-22/23 |
Manzanilla Mayaro Road, Ch.3+720 to
4+360 (Rehab./Reconst. Package 5) |
Kall Co Ltd. |
$ 16,899,839.55 |
111 |
09/04/2023 |
GW 1079-22/23 |
La Horquette Valley Rd. off WMR.
Glencoe (Slope Stab & Assoc. Wks) |
Premium Maintenance & Repairs Co.
Ltd. |
$ 3,112,683.75 |
112 |
09/05/2023 |
VW 560-22/23 |
Lambie Street, Vistabella Spain (Road
Rehabilitation) |
Harry Persad & Sons Ltd. |
$ 607,476.38 |
113 |
09/05/2023 |
VW 559-22/23 |
Fabian Street, Vistabella (Road
Rehabilitation) |
Seereeram Bros Ltd. |
$ 478,254.15 |
114 |
09/05/2023 |
VW 558-22/23 |
Redwood Drive, off Cypre Boulevard
(Road Rehabilitation) |
General Earth Movers Ltd. |
$ 512,263.13 |
115 |
09/05/2023 |
VW 557-22/23 |
Mahogany Av. From Pleasantvill Circ.
To Coconut Blvd. (Road Rehab.) |
Kall Co Ltd. |
$ 1,005,184.13 |
116 |
09/05/2023 |
GW 1104-22/23 |
Sackville Street, off Wrightson Road,
POS (Road Rehabilitation) |
Kall Co. Ltd. |
$ 1,048,828.28 |
117 |
09/05/2023 |
GW 1103-22/23 |
Richmond Street, off Tragarete Road,
POS (Road Rehabilitation) |
Jusamco Pavers Ltd. |
$ 1,262,434.39 |
118 |
09/05/2023 |
GW 1100-22/23 |
Shine Street, off Charles Street, POS
(Road Rehabilitation) |
Seereeram Bros Ltd. |
$ 1,029,234.90 |
119 |
13/9/2023 |
GW 1057-22/23 |
Western Main Road Cocorite (Flood
Alleviation Project) |
Kall Co Ltd. |
$ 3,649,806.91 |
120 |
13/9/2023 |
VW 561-22/23 |
Mossette Vale, Iverene Drive &
Forrest Av., Cocoyea (Road Rehabilitation) |
Jusamco Pavers Ltd. |
$ 602,799.86 |
121 |
13/9/2023 |
VW 562-22/23 |
Bulbosa Drive, Orchid Gardens
Pleasantville (Road Rehabilitation) |
Seereeram Bros Ltd. |
$ 755,179.43 |
122 |
13/9/2023 |
VW 563-22/23 |
Pharoah Avenue, Ste. Madeline (Road
Rehabilitation) |
Jusamco Pavers Ltd. |
$ 705,419.55 |
123 |
13/9/2023 |
VW 564-22/23 |
Cipero Road, St. John's, St. John's
Village (Road Rehabilitation) |
Seereeram Bros Ltd. |
$ 1,044,288.38 |
124 |
13/9/2023 |
VW 565-22/23 |
Midas & Ersa Lane, Corinth Hills
(Road Rehabilitation) |
Harry Persad & Sons Ltd. |
$ 1,006,103.25 |